Case Studies

Latest Projects

Case Study: Dudley College

Dudley College

Dudley college campus

Digiland has been awarded a tender for Dudley college to convert all of their internal lighting to energy efficient LED�s.

> read more
Case Study: Wrekin Sheetmetal Ltd

Wrekin Sheetmetal Ltd

Energy reduced by 1/3

Wrekin Sheetmetal had 72 x 400W Metal Halide lamps fitted and were paying over �9000 a year on just their lighting.

> read more
Case Study: Stan Robinson

Stan Robinson

Carbon Trust funded Refit.

Following a review of lighting in the existing 200,000 sq ft warehouse facility, they contacted Digiland to determine what options were available.

> read more
Case Study: Royal Orthopedic Hospital

Royal Orthopedic Hospital

Trial Refit.

The NHS is renowned for strict budgets and saving money wherever possible, so when we approached the Royal Orthopaedic Hospital with a solution to their significantly high electricity costs they were keen to try out our products.

> read more
Case Study: CPL Print

CPL Print

Complete lighting replacement.

The current lighting system consisted of a mixture of fittings housing five foot and six foot fluorescent lamps that had depreciated badly due to lack of maintenance.

> read more

Companies we Have Worked with

The improvement in lighting is noticeable and has been achieved with a significant reduction in electricity consumption

Project Manager, Peter Ulleri ,Stan Robinson